Calms Cramps & Spasms Reduces Bloating & Gas Enteric-Coated Formula Clinically Studied Ingredients Peppermint, Ginger & Fennel
Review Badge
4.5/5 Based on 5,144 Reviews

Gutwell Peppermint Oil Gels

Real Relief From Bloating, Cramps, and Painful Urgency

  • Eases sharp cramps and spasms fast
  • Deflates tight, hard-belly bloating
  • Calms the sudden urge to go
  • Enteric-coated to release where needed
MONEY-BACK GUARANTEE 60 DAYS
60-day Guarantee
Doesn't live up to what we say? Every dollar back. No hoops. No drama.
Gutwell — Product Accordion
Shipping Information

Fast, tracked shipping on every order. Most orders arrive within 10 to 12 days depending on your location, with tracking emailed the moment your order ships.

Questions about your delivery? Our support team is happy to help at any time before or after your order arrives.

Our Guarantee

Every bottle is backed by our 60-day money-back guarantee. Try Gutwell for a full two months, and if you're not happy with how you feel, send it back for a full refund. No hassle, no fine print.

Benefits of Gutwell

Gutwell Peppermint Gels pair clinically studied enteric-coated peppermint oil with ginger and fennel in one small, easy-to-swallow softgel, built to calm the gut where it matters, not the stomach.

  • Helps relieve occasional bloating and post-meal fullness
  • Supports digestive comfort and eases minor cramping
  • Ginger and fennel help settle the stomach and calm gas
  • Enteric coating releases lower down, so no peppermint burps or reflux
  • All-natural formula, no wheat, gluten, dairy, or egg

These statements have not been evaluated by the FDA. This product is not intended to diagnose, treat, cure, or prevent any disease. Individual results vary.

Ingredients

Three targeted botanical oils in an enteric-coated softgel. Clean formula, nothing you don't need.

Per Serving · 2 Softgels · 45 Servings
Peppermint Oil 392 mg
Ginger Oil 35.2 mg
Fennel Oil 38.8 mg
Other ingredients: softgel capsule (gelatin, glycerin, water, enteric coating, carob) and soybean oil. Daily Value not established. Made in a GMP facility. Not manufactured with yeast, wheat, gluten, milk, egg, fish, or shellfish.

Only sold here

This is the only place we sell it. Anything on Amazon or a marketplace isn't ours, and we can't vouch for what's in the bottle.

Three Oils, Proven to Calm Your Gut

Every oil in Gutwell is chosen for what the trials actually show — not just tradition.

Peppermint Oil
Peppermint
Calms the cramping
  • Relaxes the muscle spasms behind sharp cramps
  • Soothes the painful, sudden urge to go
  • The most-studied natural remedy for gut comfort

In a 4-week study, 3 in 4 people cut their IBS symptoms by over half. (Source: Cappello et al., 2007)

Ginger Oil
Ginger
Settles the fullness
  • Helps the stomach empty faster, so food doesn't sit
  • Eases the heavy, over-full feeling after meals
  • Naturally calming on a sensitive stomach

Ginger helped the stomach empty about a quarter faster after meals. (Source: Hu et al., 2011)

Fennel Oil
Fennel
Clears the gas
  • Targets the trapped gas that makes the belly hard
  • Helps you feel lighter, not tight and distended
  • Traditionally used to ease bloating and wind

Over 30 days, a fennel blend cut IBS symptoms roughly in half. (Source: Portincasa et al., 2016)

Try Gutwell Peppermint Oil Risk-Free Today
60-Day Money-Back Guarantee
Gutwell — Your Journey

Your Gutwell Journey Ahead

What consistent daily use actually looks like, week by week.

Week 1

Easy Start

  • Simple 2-softgel daily routine, small and easy to swallow
  • Enteric coating releases lower down, so no peppermint burps or reflux
  • Gentle on the stomach and easy to stay consistent with
  • Many people notice lighter, calmer digestion after meals
Weeks 2–3

First Changes

  • Occasional bloating and post-meal fullness start to ease
  • Less gas and pressure after eating trigger foods
  • Stomach Cramps feel more settled through the day
  • Daily routine feels natural and simple to keep up
Weeks 4–6

Visible & Felt Results

  • Waking up with a flatter, more comfortable stomach
  • More freedom to enjoy meals out without the after-effects
  • Steadier digestive comfort from morning to evening
  • Feeling more like yourself, lighter and more at ease
Week 6+

Long-Term Comfort

  • Digestive comfort feels steady and dependable
  • A calm, consistent routine built around real daily relief
  • Confidence to eat, travel, and go about your day
  • A gut that finally feels like it's working with you

How Gutwell Stacks Up

See why people switch to enteric-coated peppermint oil for daily digestive comfort.

Gutwell Original
Others Knock-off
Calms the muscle spasms behind cramps
Ginger & fennel help clear trapped gas
Enteric-coated, releases past the stomach
Gentle & natural, no harsh drugs
One easy softgel, no diet overhaul
60-day money-back guarantee

Gutwell — Clinical Stats

Real, Clinically-Backed Results

Enteric-coated peppermint oil has been studied for years. Here's what the research shows for digestive comfort.

79%
felt less abdominal pain after taking enteric-coated peppermint oil
Source: Liu et al., 1997
83%
had less bloating and distension within weeks
Source: Liu et al., 1997
75%
saw their IBS symptoms cut by half or more
Source: Cappello et al., 2007
79%
had less gas and flatulence after meals
Source: Liu et al., 1997

Figures reflect published clinical research on enteric-coated peppermint oil, not results specific to Gutwell. These statements have not been evaluated by the FDA. This product is not intended to diagnose, treat, cure, or prevent any disease. Individual results vary.

Try Gutwell Peppermint Oil Risk-Free Today
60-Day Money-Back Guarantee

Real Stories, Real Relief

★★★★★
A lifesaver for digestion

"If you struggle with bloating, indigestion, or that heavy feeling after meals, these are a total game-changer. Within 20–30 minutes after taking one, I feel my stomach settle and the bloating significantly decrease. I wanted a natural solution that wouldn't upset my system or require prescription meds — this is it."

Rachel M. · ✓ Verified Buyer
★★★★★
Works better than my prescriptions

"I was skeptical they'd work because nothing else had. I find these work better for me than prescription meds, and they don't interact with anything else I take. I can take them as needed, with or without food. They calm my stomach so well — I finally feel settled after eating."

David K. · ✓ Verified Buyer
★★★★★
Best stomach soother

"It's gentle, reliable, and fast-acting. I take this at least 30 minutes before a meal, twice a day for my IBS, and it helps prevent any painful bloating. It's become a real part of keeping my gut calm."

Sarah T. · ✓ Verified Buyer
60 DAYS MONEY-BACK GUARANTEE
Zero risk

Give your gut 60 days.
That's the fair test.

Most people feel the difference in the first week — less bloating, calmer cramps, fewer sudden dashes to the bathroom. So we give you two full months to feel like yourself again, entirely on us.

FAQ

What's actually in it?
Three enteric-coated botanical oils and nothing you don't need. Each serving (2 softgels) contains Peppermint Oil (392 mg), Ginger Oil (35.2 mg), and Fennel Oil (38.8 mg). Peppermint calms the spasms behind cramps, ginger helps your stomach empty so food doesn't sit and bloat, and fennel clears trapped gas. Other ingredients are just the softgel itself (gelatin, glycerin, water, enteric coating, carob) and soybean oil. Made without gluten, wheat, milk, egg, fish, or shellfish, in a GMP facility. 45 servings per bottle.
How do I take it?
Take 2 softgels with water 30 to 60 minutes before a meal, two to three times a day, before every meal.
Shipping info
Shipping is free on every order. Delivery currently takes 10 to 12 days, and you'll get tracking as soon as your order is on its way.
Will it give me the "minty burps" or heartburn other peppermint pills gave me?
That's the most common complaint about ordinary peppermint capsules, and it's exactly what the enteric coating solves. Uncoated capsules dissolve in your stomach, which pushes that minty burning back up. Gutwell's coating keeps the oil sealed until it's safely past the stomach, so it releases where it's needed and not where it causes reflux.
I've already tried plain peppermint capsules. Why would this be different?
Two reasons. First, the enteric coating: most cheap capsules aren't properly coated, so the oil never reaches your intestines intact. Second, plain peppermint only handles spasms. Gutwell adds ginger and fennel, so it covers bloating and trapped gas too. Three problems, not one.
How long before I feel a difference?
Many people notice the sharpest cramping easing within the first couple of weeks, with fuller relief building over about 4 weeks of consistent daily use. In studies of this approach, 3 in 4 people cut their symptoms by more than half at the 4-week mark. Individual results vary.
Is it safe to take with my medications?
Peppermint, ginger, and fennel are generally very well tolerated. Still, if you take prescription medication or have a medical condition, check with your healthcare provider before starting any new supplement.
Can I take it if I'm pregnant or breastfeeding?
If you're pregnant or breastfeeding, please check with your healthcare provider before use.
I've tried everything and nothing worked. Why should I believe this will?
That skepticism is fair. Most people who find Gutwell have already been let down by diets, fiber, and prescriptions. But cramps and bloating aren't a food problem, they're a muscle-and-gas problem. Diets can't relax a spasming gut, and single-ingredient remedies only solve one piece. This targets all three, which is why it works when the others didn't.
What if it doesn't work for me?
You're covered by our 60-day money-back guarantee. Try it, and if it's not right for you, we'll refund you. The only risk is staying uncomfortable.
Try Gutwell Peppermint Oil Risk-Free Today
60-Day Money-Back Guarantee